Basement Renovation w/ Fireplace

This was a small basement renovation that included the creation of a recreation room, master bedroom (w/ shoe closet), and a utility room.  An electric fireplace was installed to add warmth to the space for the chilly months.

 

Low Basement Renovation

This client had a large unfinished basement with low ceilings (73") and a small "hobbit door" leading outside.  The project included the installation of a new furnace along with a new recreation room, a laundry room, closet, storage, and the addition of a new 3/4 bathroom.   While we were at it, we installed all new windows, addressed major electrical issues, and installed 'earthquake strapping'.  We also put in a 20' steel I-beam to open up the space as well.  While super difficult to carry in by hand (600 pounds), it was worth it in the end. 

 

Edmonds Condo Renovation

This condo needed a lot of work (it was pretty gross).  The previous tenants mistreated the place and the owners decided to completely renovate it so they could get better renters.  The project included a new kitchen, a partial bathroom update, along with flooring, trim, lighting, and paint throughout.

 

SandPoint Condo

The owner was looking to sell this condo and wanted top dollar.  Her realtor recommended a full renovation and brought in a different contractor.  After some demolition and minor work, he bailed on them with no explanation.  Luckily, SoundTech was able to step in and finished the project on-time and on-budget.  The results were fantastic and the condo broke the previous sales record in the complex by over $50K.  The scope included a new kitchen, partial bath remodel, flooring/paint/trim throughout.

 

Capital Hill Condo

This was a "buy-fix-sell" investment property for a realtor.  Our scope included a new kitchen, new bathroom, flooring/paint/trim throughout.  This was a fast execution project and was completed in a little over 1 month.

 

Magnolia Condo

This project was a simple cosmetic update of a small condo.  Improvements included painting of the entire space including cabinets, installation of a stacked stone wall around the fireplace, new carpeting, updated lighting, and renovation of the bathroom.   The project took a little under 1 month.